Home : News : Photos
Photos
Russel Windham, a contractor with Advanced Concrete Cutting, drills holes into concrete during the deconstruction of pier Charlie at Joint Base Charleston-Weapons Station, March 13. The holes will be used as anchoring points for a crane to lift sections of the pier. Pier Charlie is being demolished as part of a program to remove excess infrastructures. Once Pier Charlie is dismantled, workers will build a smaller pier to allow Harbor Patrol Units access to the 628th Logistics Readiness Squadron Port Operations Facility.  (U.S. Navy photo/Petty Officer 1st Class Jennifer Hudson)
120313-N-IW469-014.JPG Photo By: Unknown

Russel Windham, a contractor with Advanced Concrete Cutting, drills holes into concrete during the deconstruction of pier Charlie at Joint Base Charleston-Weapons Station, March 13. The holes will be used as anchoring points for a crane to lift sections of the pier. Pier Charlie is being demolished as part of a program to remove excess infrastructures. Once Pier Charlie is dismantled, workers will build a smaller pier to allow Harbor Patrol Units access to the 628th Logistics Readiness Squadron Port Operations Facility. (U.S. Navy photo/Petty Officer 1st Class Jennifer Hudson)


DOWNLOAD PHOTO (0.98 MB)


This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at http://www.dimoc.mil/resources/limitations.html , which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.



Back to Gallery